James
Thomas
Archaeological Work Experience:
Environmental Corporation of America
1375 Union Hill Industrial Court, Suite A
Alpharetta, GA 30004
(770) 667-2040 Extension 111 (Office)
(770) 667-2041 (Fax)
Projects: At this position I was tasked typically every week with completing Archaeological and Phase 1 Environmental surveys of multiple FCC Compliant communication towers a week. I was responsible for conducting all archaeology on these projects in accordance with SHPO and ESTO standards. As well as making sure construction will not negatively impact wetlands or endangered species.
Typically my work here has been in the following states: Mississippi, Alabama, Georgia, Florida, North Carolina, South Carolina, Texas, Louisiana, Tennessee, Missouri, Kentucky and Kansas. I also conducted SHPO historic research for most of the projects in Alabama.
6/6/2016 to current
New South
6150 East Ponce de Leon Avenue
Stone Mountain, Georgia 30083
(770) 498-4155
PROJECT: Field tech and Crew Chief during a petroleum pipeline survey through central Virginia
LG2 Environmental Solutions, Inc.
14785 Old St. Augustine Road, Suite 4
Jacksonville, Florida 32258
Phone 904-288-8631 or 1-800-435-0072
Fax 904-262-8637
Project: In this
position I was a Crew Chief tasked with leading a crew of 4-5 in walk over
survey of several Impact areas, on the Ft.
Stewart Army Base in Hinesville, Ga
Environmental Corporation of America
1375 Union Hill Industrial Court, Suite A
Alpharetta, GA 30004
(770) 667-2040 Extension 111 (Office)
(770) 667-2041 (Fax)
Projects: At this
position I was tasked typically every week with completing Archaeological and
Environmental surveys of multiple FCC Compliant communication towers a week. I
was responsible for conducting all archaeology on these projects in accordance
with SHPO and ESTO standards. During my time here I completed numerous cell
phone tower surveys and environmental surveys in Mississippi, Alabama, Georgia,
Florida, North Carolina, Tennessee, Missouri, Kentucky and Kansas. I also
conducted SHPO historic research for most of the projects in Alabama.
Stone Point Services, LLC
Office: (903) 484-4041
Fax: (888) 247-1760
Cell: (903) 952-3819
E-Mail: Todd@StonePointServices.com
Website: www.StonePointServices.com
Project: Lone crew of a Cell phone survey in Huntsville, AL
Cultural
Resource Analysts (CRA)
151
Walton Avenue
Lexington,
KY 40508
859.252.4737
office
859.254.3747
fax
Supervisor(s):
Kay Simpson, Mike Clem
Sep
2013- Nov 2013
Project:
Mobility 460. A Phase I survey in southern Virginia for a proposed new highway
linking Petersburg Va, to Suffolk, Va. This project included shovel testing and
pedestrian survey of wooded areas and vegetated and open fields.
Gray
and Pape, INC
1318
Main Street
Cincinnati,
OH 45202
513.287.7700
Fax
513.287.7703
Supervisor(s):
Pat Trader
August
2013
Project:
A phase II testing of multiple prehistoric sites in Vinton County Ohio. Work
consisted of excavating 1x1 m units and site clearing.
DESCO
26902
Nichols Sawmill Rd.
Magnolia,
TX 77355
Office:
281.252.9799
Toll
Free: 866.261.8668
Fax:
281.789.1003
Supervisor(s):
Gary Kowalski
July
2013
Project:
A Phase I Seismic Survey in the Homochitto National Forest. Work consisted of
excavating shovel tests in surprisingly hilly terrain.
Blanton
& Associates, Inc.
5
Lakeway Centre Court, Suite 200
Austin,
Texas 78734
Phone: (512) 264-1095
Fax: (512) 264-1531
Supervisor(s):
Joe Sanchez, Robert Beckwith,
June
2 2013- June 21 2013
Project:
Phase I Survey for Indigo Connector pipeline, a small pipeline north of
Logansport, La. the survey involved surveying within 100 m of delineated
wetlands for USACE compliance.
Geo-Marine
2201
K. Ave Ste. A2
Plano,
Tx 75074
972.423.5480
Supervisor(s):
Aaron Hockman, Arlo McKee, Leonard kemp,
11/26/12
- 05/1/13
Projects
: Phase I & II, Avon Park Bombing Range, Avon Park, Florida.
Phase
II PAX River Navy Air Station Testing, California, Maryland
Phase
II Testing, Moody Air Force Base, Valdosta Ga.
Phase
II Testing, Joint Base Langley-Eustis, Hampton Roads Va.
41HS973
Phase II, Assistant laboratory technician
Perennial
Environmental
13100
Northwest fwy ste 160
Houston
Tx 77040
713-462-7121
Supervisor:
Cindy Carter-Davis, Chris
Aug
2012- November 2012
Project:
South Eastern Market Expansion. Phase I survey for a natural gas pipeline for
Gulf South that stretched from Hattiesburg, Ms. to Mobile, Al.
R.S.
Webb & Associates
P.O.
box 1319
Holly
Springs Ga 30142
Supervisor:
Steve Webb, Dave Port
Feb-march
2012
Project:
Phase I Survey for Haile Gold Mine Co., near Kershaw, S.C.
New
South
6150
East Ponce de Leon Avenue
Stone
Mountain, Georgia 30083
(770) 498-4155
Supervisor(s):
Valerie Davis, R. Jeannine Windham
Oct
2010 - Nov 2011
Projects:
Various small Phase I Surveys in near Atlanta Ga, and one highway survey SC 51 near
Florence, SC.
R.S.
Webb & Associates
P.O.
box 1319
Holly
Springs Ga 30142
Supervisor:
Steve Webb, Dave Port
Dec
2007 - Sep 2010
Project:
During this time I was a full time Archaeologist with R.S. Webb. I sometimes
served as a Crew Chief/Field Supervisor, Field Technician, Lab Technician, Report
Author, Researcher, and as “Screen Czar”. I also recorded and reported
archaeological sites for the state site files. During this time I often conducted
research at the State Historic Preservation Office in Atlanta, Ga. for National
Register of Historic Places, and at the Georgia State Archives in Morrow, Ga. I
often worked and interacted with land owners, clients, and curious locals.
Unfortunately, I was laid off due to the negative effects of the economy.
The
most interesting projects that I worked on at this time include:
9FY173
Sany Testing: A Phase II testing of a site dating from the Mid-Archaic, Late
Archaic, and Woodland (Cartersville phase) in Fayette Co. Georgia. In which I
served as Field Director.
Tillman
Tract EVHD Phase I (aka Pettit Creek). A survey for a proposed lake on Pettit
Creek in Cartersville Ga. Within the Etowah Valley Historic District. Bartow
Co. Georgia. In which I served as Field Director.
9WN114
Hard Labor Creek Reservoir Dava Recovery. A Multi-component site with a late
Paleo Dalton component. Walton Co. Georgia.
9CW120
Lake McIntosh Data Recovery. An excavation of a mid-Archaic through Woodland
site. Coweta Co. Georgia.
8LE283
Myers Park Tower Testing. A testing project for a communications tower in
Tallahassee, Florida.
Genesee
Testing. Phase II testing of several sites including prehistoric and historic
such as: 9CW98, a Woodland – Mississippian site; and 9CW300 a possible Lamar
era Mississippian farmstead. Coweta Co. Georgia.
Tired
Creek Testing. A Phase II excavation of 6 different prehistoric sites near
Cairo, GA. Highlights of the sites tested are a possible Late Paleo/Early
Archaic site, and Weeden Island village. Grady Co. Georgia.
Fernbank Museum of Natural History
767
Clifton Road, NE
Atlanta,
GA 30307
404-929-6304
Supervisor:
Dennis Blanton,
Nov
- Dec 2007
Project:
9TF145 An ongoing excavation, originally searching for the Santa Isabel de
Utinahica mission. An intensive excavation of an early Spanish contact site in
Telfair County, GA. The site is a Native American site that has consistently
produced diagnostic sixteenth-century artifacts very likely derived from
Hernando de Soto's passage through the area in 1540. Fieldwork involved
hand-excavation of a large blocks of contiguous units.
Mactec
9725 Cogdill Rd, #101
Knoxville
TN
The
CRM division is now out of business
July
– Nov 2007
Project:
Phase III Excavation of the Dickinson Farm Site (46KA111), located 10 miles
southeast of Charleston, WV. The site
featured a variety of intact prehistoric deposits
as
deep as 3 meters, which included Early and
Middle Archaic, Middle Woodland, and Fort Ancient and potentially Paleoindian
deposits.
TRC
Douglasville,
GA
2976
Chapel Hill Road
Suite
100
Douglasville,
GA 30135
Phone:
770.947.4272
Fax:
770.947.4277
Supervisors:
Sterling Howard,
April
– July 2007
Project:
Mid-Continent Express Pipeline. A survey for a pipeline from Oklahoma to
Alabama.
Pan
American Consultants
2301
Paul Bryant Drive
Tuscaloosa,
AL 35401
MAILING
ADDRESS
Post
Office Box 20884
Tuscaloosa,
AL 35402
Phone:
205-248-8767
Fax:
205-248-8739
Supervisor:
Aug
06-Feb 07
Project:
Camp
Shelby Survey of multiple DOD units in the Camp Shelby, MS National Guard
training base.
Earth
Search INC
407
Briargrove Dr.
Slidell,
La 70458
Supervisors:
Jason Parrish, Paulette Steeves
May-Aug
2006
Project:
Continental Connector Pipeline Project, a pipeline survey through South west Arkansas.
Geo
Marine Inc
550
E. 15th st.
Plano,
TX 75074
972)
423-5480 voice
972)
422-2736 fax
Supervisor:
Tiffany Osburn
Sep
2005
Project:
A survey in the cantonment area of Tyndall AFB in Panama City, Florida.
Prentice
Thomas & Associates
P.O.
Box 4246
Ft.
Walton Beach, Fl. 32549
Supervisors:
Jennifer Mack, Brian Schultz
Nov
2003- April 2005
Projects:
My
duties here included survey of Eglin Air Force Base, including areas as diverse
as woodlands, swamp marsh, and even bombing ranges. I also received Explosive
Ordinance & Disposal (EOD) training to be a "sweeper I". While
working here I also excavated such sites as:
8SR17 a shell midden site, dating from the late archaic
- Mississippian
8OK Camp Pinchot, the first National Forest
base, now upper level Eglin AFB housing 8OK1012 Indianola Inn mound, Site of a
mound bought by private developers.
8OK952
a multi-component site including a Paleo point, and shell midden
8OK835
Historic site
8OK2344
Prehistoric site (late archaic-early woodland)
Black
Stone Survey, survey of a future golf club
New
South Associates:
6150
E. Ponce de Leon Ave.
Stone
Mt. GA 30083
Supervisor:
Joel Gunn
Nov
2003
Project:
N Fayetteville Loop/FOL 204. Additional survey work for NCDOT for an outer
loop
of Fayetteville N.C.
R.S.
Webb & Associates:
P.O.
Drawer 1319
Holly
Springs, GA 30142
800-399-8639
Supervisors:
Steve Webb, Bill Jordan, Beth Gant
August
2002 to May 2003
Projects:
38BU890:
An excavation on Hilton Head Island, S.C. of a Confederate War era Union Camp.
Hog
Mt.: A 46-acre survey of an area in NE Atlanta
9HY328:
Big Cotton Indian Sewer Line testing and Delineation of a site
9CK1133:
A data recovery of an Archaic Site
"Fulton
Co. Reservoir " Data recovery of one of the prehistoric sites found on a
survey of an intended reservoir
A
daylong survey of a 20-acre area that included one small prehistoric site and a
Civil War trench.
38BU890
An excavation on Hilton Head Island of a Civil War camp. Buford Co. South
Carolina.
9PK48
Pike Co. Reservoir. An excavation of multi-component site
(late-paleo-historic). Pike Co. Georgia.
9BA165
An excavation around a soap stone quarry with unfinished bowl still on the
bolder. Banks Co. Georgia.
9CK1133
Prominence Point Data Recovery. An excavation of a purely Archaic (early-late)
period site. Cherokee Co. Georgia.
TRC
Garrow Associates:
501
Washington St., Suite F
Durham,
NC 27701
Supervisor:
Dino Ruggiero, Cullum,
November
2001-June 2002
Projects:
Ft.
Bragg Survey: Several surveys that included thousands of acres of the Army base
in Fayetteville, NC.
Camp
Le Jejune survey: Survey that included mostly marsh areas of the Marine base
located in Jacksonville, NC
Southern
Research:
55
Doe Trail
Ellerslie,
GA 31807
Supervisor:
Scot Kieth
Project:
Sumter
National Forest Survey: Survey of multiple compartments and stands within
the
National Forest located near Greenwood, S.C.
New
South Associates:
6150
E. Ponce de Leon Ave.
Stone
Mt. GA 30083
Phone:
(770) 498-4155
Supervisors:
Brad Botwick, Theresa Hamby,
June
2001-September 2001
Projects:
N.C. 24 Survey of an interstate
corridor, with some phase 2 work. The corridor connected I-95 from Fayetteville
N.C. to I-40 in Clinton N.C.
Fayetteville
Loop/FOL 204 Survey with mitigation work for NCDOT for an
outer
loop of Fayetteville N.C.
MOTSU
Truck pads Sunny Point N.C. Survey on the Army Military Ocean Terminal at South
Point, for the Army Corp of engineers.
No comments: